NINI
The gas produced at the Nini Field is injected into the Siri Field together with injection water, and Siri supplies Nini with injection water and lift gas. The vessel ESVAGT INNOVATOR are deploying 8 measurement stations (Seismicty baseline station) around the Nini field, approx. 18/2-2025. The stations will measure natural seismicity and be left on the seabed for one full year. There will be no surface expression and hence traffic is not obstructed. However, trawling across these stations should be avoided. |